TÜCHLER once again equips a Polish opera house, this time the interim venue in Szczecin.

Alternative venues often have their own character and usually have to be built and maintained with a small budget. However, this was not the only reason for choosing the alternative cable winches LIFT IT from TÜCHLER for the interim venue in Szczecin. The goal was to install an affordable lifting system for lighting trussings, fly bars or point loads.

This was solved by installing LIFT IT PW-300/500 cable winches at ground level that can be synchronously controlled depending on their application.

The lighting trussings can also be raised and lowered. The entire system meets the requirements of BGV-C1 and thus ensures safe working conditions. In addition, the TT1 track system was used for several fly bars and the main curtain.

 

Development & Production & Installation

  • 13x LIFT IT PW300
  • 15 rm TT1 track
  • 2x TOPKAT chain hoists
  • control system, BGV-C1