The global forklift technology company had very specific requirements: a part for a new premium vehicle was to be produced at the main factory in Ingolstadt. Two floors, each with a height of 16 meters, were adapted using flexible constructions. The open gratings required a covering to ensure that no parts could fall down over several levels.

On the other hand, the sprinkler system mounted on the ceiling had to be able to effectively extinguish the complete area on all levels. This meant that on the one hand the covering had to reliably protect against even smaller parts from falling, while at the same time remaining permeable. Tüchler Gauze B1 proved to be the perfect solution.

Schramm Flurfördertechnik

Delivery & Assembly & Disassembly

Cover with gauze for large areas in the vehicle production - 24,000 square meters of Gauze B1 were used