Referencje

  1. Ballet Days 2013

    Under the auspices of the ballet director of the Vienna State Ballet, Manuel Legris, and the artistic direction of Eva Petters and Gregor Hatala, Vienna was once again the centre of attention in Europe for dance for the International ÖTR Ballet Days Competition in Vienna's Odeon theatre.

    The competition is an initiative of the Austrian Dance Council for the development and promotion of dance. Each year it brings Austrian and international ballet schools and dance studios together.Thus, dancers from approximately 20 dance-training centres came together to share their very special performances at the distinguished Odeon theatre in Vienna.The ecstatic audience and fans enjoyed the evening performances of high calibre choreography that were perfectly executed by young international artists in strong dance sequences.

    TÜCHLER once again provided the basis for the performances, in other words the dance flooring, to ensure the protection of the dancer’s health during their contemporary dance movements. The main stage was once again equipped with the proven MANERO ULTRA-LITE and the dance flooring EVENT. Covering an area of approximately 300 m², the MANERO ULTRA-LITE sprung floor was installed in no time

    The comments of individual dancers confirmed the extreme quality of MANERO ULTRA-LITE:

    Victoria Jaiani & Temur Suliashvili (principal dancers Joffrey Ballet): “Dancing in Vienna especially at the Odeon Theatre and on this floor is really amazing.” (picture: © Thomas Lerch)
     
    Rainer Krenstetter (Berlin State Ballet principal dancer): “The flooring is extremely comfortable to dance on, especially the sprung floor under the linoleum that cushions while dancing, and it is not slippery.” (picture: © Thomas Lerch)
     
    Pascal Loussouan (Bruce Taylor Company Choréonyx):
    “It is a unique experience performing on this special floor at the Ballet Days. This floor is an ideal surface for contemporary dancers.” (picture: © Thomas Lerch)
     

    Scope of Service:

    •Production
    •On-site installation

    Materials:

    •18 x custom structures
    •500 m² stage molleton BÜHNENMOLLETON LIGHT
    •Aluminium custom platform 4 m x 4 m

     

    zurück

Sie haben Fragen zu Produkten, Dienstleistungen, Konfektionen oder Funktionen des Webshops?

Ich helfe Ihnen gerne persönlich weiter!

Rufen Sie mich während der Bürozeiten

Mo-Fr 9:00 – 17:00

einfach an oder senden Sie mir ein mail!

Malgorzata Kozakowska

e-mail: kozakowska@tuchler.pl
t:+48 (22) 647 90 50
m:+48 501 089 943
f:+43 (1) 2533033 1870


Brauchen Sie Hilfe?